Somehow I do this week to nothing but the Panthers I want to go to Saturday in Dernbach.
Therefore, today was the gearbox fitted to the series.
Since I want to flanges and inertias to the engines but I can not install this in the usual way, because I need some more space under the engine for this. So I build a slanted transmission pad and these three aluminum parts for the Bassi.
First I milled the wedge-shaped supports.
So I can install them are still necessary cutouts for the axes.
The support plate is then glued and screwed. Here I bring just to the holes for bolting.
The holes for the mounting in the tub I drill through the entire bracket. So it is easy to place them behind in the pan.
The flywheels I had finished they were lying there and quickly installed. Also the gearbox were then installed quickly, even if I have to cheat a little bit and move it slightly to the old position. In addition I have some polished the old hole.
Recently I have put two large ball bearing axle support as this and glued with epoxy to the kneading trough.
Morning then och shortened the axles fit and I can slowly begin the installation of the electronics.