hello,
I want you to show you the expected chain tensioning system for the Tamiya Leopard 2A6.
The system can also be installed with the AFV-Hull-stiffening, the accompanying axes with 2 ball bearings can also be used for the AFV Metall-idler wheels.
Can be assembled from the kit with axles and bearings can be seen in the pictures also the idlers.
Both sides of chain can be tensioned separately outside of the tub.
The set screws for locking the eccentric are 4mm thick and it will need a 2mm Inbus-screwdriver.
The installation is done quickly, the opening in the trough is present on extended 10mm.
The bushes themselves are then used as a template for the 2mm holes to be drilled.
This item is available for purchase starting next week in the shop.
With regards,Guido